This report provides illustration photos of the Berloz wind farm in Belgium. The wind farm consists of ten turbines, seven in the municipality of Berloz and three in the municipality of Geer. The ten turbines were built in two phases alongside a motorway and have been operational since 2009 and 2015. It is the result of a collaboration between Luminus and Eneco Wind Belgium.
Images show general views of the wind turbines, technicians preparing for going into the wind turbine for maintenance, inside views of the tower as well as views from the top of the wind turbine.